Project: KMYARV12   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Howard Kaney   -  
Project:   Vans - RV-12iS   -   VIEW REPORTS
Total Hours:552.8
Total Flight Time:
Start/Last Date:Aug 17, 2020 - Jun 10, 2022
Engine:Rotax 912iS Sport
Panel:Dynon Skyview dual screen
 
Friendly URL: https://eaabuilderslog.org?s=KMYARV12

Home or Last Project Picture

Feb 14, 2021     Worked on multiple sections - (3 hours)       Category: Fuselage
Left Wing (Holden Glass): Went forward and looked ahead at the plans (fuselage and wings). Started looking at potential issues we could have in future steps.
Right Wing (Maggie Colwell): Did machine countersinking on a part.
Fuselage 1 (Josh Weiss): We got a piece ready to attach to the bulkhead. We worked on the fuselage floor.
Fuselage 2 (Rebecca Colwell): We drilled and riveted on parts on the bulkhead. We had a mix up with the nut plates and we had to bend the part around to get the nutplate in.
Wing Ribs (Harsh Patel): We snipped and deburred 28 nose rib pieces. The band saws were not equipped with proper saw blades, so we had to use shears. It was a lot harder and less perfect, but it was what we had.
Larry Sullivan: We are getting the parts in the fuselage ready. Once we are ready to connect to them we will really start building a large section of the plane.


 